Sunday, December 11, 2016

Blue By Hue............wasn't that a Linda Ronstadt song ?



 Because a steel frame conducts the outside temperature so much easier than wood, it's necessary to provide some resistance to that thermal flow.

So we're now sheathing the exterior with a foam board to insulate the steel studs.

A helpful side effect is that the interior & exterior spaces now have definition, & you can get a better feel for the eventual size & volume of those spaces.
Eventually, a second, more sturdy sheathing will cover the blue board. And the walls and roof rafters will be sprayed with foam insulation, all the way to the roof decking.

In effect we'll be creating a "thermos bottle" effect to keep our energy bills low.

It costs a bit more to build this way, but I always tell clients that " You can pay now, or pay later, when the power bill arrives."

When all of a sudden, what should appear ????????

Even before actually purchasing the lot, one of my chores was to tidy up it's street frontage, after years of collecting heavy underbrush & tree seedlings. This would give the best existing tree specimens a chance to breathe & receive sunlight.

There was one seemingly nondescript tree that I preserved just because of it's nice shape, though it seemed to be just another tree with green foliage .

But my neighbor, a horticultural enthusiast, identified it to me as a type of pear tree. I was very skeptical of his analysis, but still glad that I had kept it.

A few weeks ago I happily realized that his diagnosis was correct. The once "just another tree" transformed itself with a beautiful fall color that is characteristic of pear trees.

I'm so glad I saved it, even if it never bears fruit.

BTW, all the existing plant life that I did remove found a new purpose as mulch for this area, & will generate excellent new top soil to nourish the flora that remains. That's the way God set up the system.................BRILLIANT !

Monday, November 21, 2016

Let's talk trash............................

I'm still very pleased with the minimum of waste we're producing.

Ronnie & Steve can cut discarded steel pieces to make connection clips, until the small remainders fill a few containers you see in the background corner.

Because the plan is designed on a 4 foot module, there was not even much leftover floor decking material.

So far I haven't needed a dumpster yet. A few waste items I've been able to just make part of our weekly neighborhood trash pickup. You just cut up larger items into small lightweight pieces.

I think I got the idea from an old Hitchcock movie. That's how the villain disposed of the body..............

And every last concrete block is being used to build a fire pit in the yard.

Shaping up.....................

In this photo you can now see the horizontal bracing ties in the roof system that will keep the large beams aligned & working as a structural unit. Soon the roof decking will be installed to add further rigidity.
 And from the exterior, the carport is finally taking shape. The last main framing item will be to add the gable roof over the upstairs loft.
From the rear view you can see the master bedroom to the left, & the porch off the living room to the right.

The master bedroom also has a door to the porch, mostly for letting the dogs out at night. This has become a chore that I can now perform while still sleeping. It's like forced sleepwalking.

Sunday, November 6, 2016

Startin' to show...........


I normally figure the time from conception to delivery of a modest sized home in our region to be 9 months.

So to continue this gestation analogy, our house is finally starting to show, from the street.

But I'm beginning to think that this baby will arrive a bit late. In this case, it's not totally a bad thing.

In today's fast paced world, I guess it's important to practice patience, and enjoy the journey without pressure to finish.

Sunday, October 23, 2016

I'm being framed.............

 Finally the roof rafters are being installed, so that the house's barn shape is taking shape.

This view is looking towards my future office.

The room's ceiling will follow the beam's slope.
 
And here's a view in the opposite direction, towards the master bedroom.

These 12 inch deep beams will eventually be filled with sprayed foam insulation. So will the 6 inch thick exterior walls, creating a "thermos bottle" effect to keep our energy bills low.

And the extra strong beams will also keep us protected from those heavy snow loads we get here in Georgia............

The carport on the opposite side of the house will have a similar roof slope. I'll be anxious to see if there will be enough height for a basketball goal there, at the high end of the carport wall. Though I'm sure I'll have to flatten out the arc of my shot.

Arbor Day...............

This steel arbor had been part of our current yard for the last 8 years. And before that it was part of the landscaping at our previous home for many more years.

So it was fitting that I move it to our future home, & this time set the base in concrete block- a permanent commitment.

We'll apply stone to the base when the masons are working on the main house.

With winter approaching, the timing will be perfect to transplant the same vines that have graced this arbor for all those years.

This structure frames in the view of an old logging trail that now has become our septic field. I'll be transplanting some other vegetation along the sides of that path in the months ahead.

Monday, October 3, 2016

A plan is not set in stone.......................

My cousin Steven, a fellow architect, asked to see some of my drawings of our future "barn" home. So here you go, cuz !

The truth is, though, that the plans are just a guideline to me. Changes have happened in the field to take advantage of new possibilities, & sometimes to adjust to unforeseen circumstances & field errors.

To me it's all part of the process. Usually I feel that the adjustments were beneficial, & I'm glad we that didn't blindly plow ahead just to follow something I drew so many months ago.
From the exterior, the typical barn shape remains the same, but I am exploring changing from all stone, to a stone & stucco combination.

The current prices, availability of materials, and scheduling of labor will all be factors in my final choices for the facade. These are factors that were totally unpredictable when I was at my desk preparing the plans.

Sunday, October 2, 2016

Quick, what's your favorite Led Zeppelin song ?

 Well, the stairway is now in. It was built in about 3 hours by 2 highly skilled carpenters who have been specializing in this for many years. With 4 glued laminated stringers, rather than the customary 3, these stairs are quite sturdy, And though the 2x12 treads are temporary, we can easily adapt to permanent finished treads & risers in the future.

Now the steel framers can easily carry the floor decking upstairs for the future loft.



With the loft decking in place, you can now look down on the exterior walls of the home;s bedroom wing.

In the very back of this photo you can see the 2 windows of the master bedroom. This room is supported by 2 columns below, so it sits high above grade, & has a good view into the woods.

Thursday, September 22, 2016

I'm absolutely floored.................

Over the crawlspace portion of the house, the sub-floor decking is now installed, & Ronnie is laying the tracks for the walls of the bedroom wing.

This decking is highly weather resistant to withstand the rigors of sun & rain. Amazingly though, this summer has been unusually dry. So zero construction days have been lost to inclement weather. Does that mean we're having clement weather ?

Looking studly today...............

The front steps are now blocked out, and walls are being framed over the slab portion of the foundation.

The extra wide steps lead to the front porch, and hopefully will be a nice spot to sit & enjoy the view from up here on the hill.

The framed walls shown here define the living, dining, & kitchen area. It's all one linear room with a porch at the living room end in the back of the house.

Above these rooms will be a large storage loft, available for future expansion. And the front window of this perch will have an even better view. You might say it will have a lofty view.

Thursday, September 8, 2016

Neatness counts.....................

Another of my duties is to start healing the site after the ravages of heavy duty construction.  I prefer to do this simultaneously as we build, rather than at the end of the job.

Out of bounds areas are defined by logs from the trees we did have to cut.

And though it will soon be trampled, I covered the bare earth around the foundation with pine straw. This will definitely keep us cleaner on the slab after a rain. And it will also jump start the rebuilding a top soil layer as this mulch deteriorates.

Bin there, done that....................

Part of my daily janitorial duties is to manage the trash & recyclables.My goal is to avoid renting a dumpster for as long as possible.

Since the floor plan design was purposely dimensioned for minimal cutting of concrete block, there little waste there.

And check out the very small pile of waste from the steel structural members so far. It's amazing how efficient Steve & Ronnie have been. When the house is finished, even these scraps can be taken to a local steel recycling business.

Low ceiling, don't forget to duct.............................

Here's how the crawlspace looks from below.

This area will house the air conditioning unit. It's much more efficient to have that in the cool crawlspace than in a warmer attic.

The floor is a thin layer of concrete to keep the vapor barrier below from deteriorating.

Looks like the next part of my duties as general job-site lackey is to re tape the vapor barrier on the side walls. Those walls will eventually be covered with sprayed foam insulation.

Steely Dan.......well actually his name is Ronnie.........

Steel joists & studs mean permanent peace of mind from termites, dry rot, & fire.

It's amazing how much care Ronnie & his construction partner Steve spend placing each piece with laser precision.

These joists support the floor of the bedroom area of our home.

Steve & Ronnie's boss recently inspected their work, and told me he thinks we can park cars in the bedroom wing. This structural system is just that sturdy.

Sunday, August 21, 2016

Barns are for people too................

Here's the original 3D model of the "barn" home design, though for a while the plan & elevations changed on an almost daily basis, as I got more familiar with the topography of the site, as well as other important constraints.

My architect was constantly furious over the incessant revisions.

But each change was a positive reaction to the reality of the site & new potential for better functionality & simplicity.

All exterior materials will be maintenance free. The walls will be stone, and the roof, soffits, & fascias shall be aluminum.

Only the inhabitants will ever show age.

Septic system is out of order..................

Normally, the septic tank & drain field is one of the last major items to be completed on a house project.

That way it will not be affected by the turmoil and potential damage that can occur on site during the construction process.

One nice feature of our lot is an old logging road that runs through it. Test holes determined that the soil was suitable for a septic field, and I sought to have our septic field located here, rather than the original location that was selected by the engineer.

My reasoning was simple, no further trees would face removal.

So we put in the septic system last week, because this area is remote enough from the remaining construction that we can hopefully keep it protected from harm.

And this also means that perhaps we can install the driveway earlier than usual, because the bulk of traffic from heavy construction vehicles is now complete.

Steel crazy after all these years.................

As with our current home, I strongly prefer framing a house out of steel, and that steel was finally delivered, now that the slab and foundation walls are cured and ready.

Besides freedom from termites and rot, there are other benefits of using steel. Fire resistance, of course is another factor. And holes are already in the joists & studs for the electrical wiring.

With wood framing there is sometimes waste due to warped or unusable pieces, and sometimes you will have nail pops in the finished sheetrock, as the wood dries and shrinks.

I also noticed another advantage this week. Because the steel members are "U" shaped, 2 pieces of steel occupy the same amount of storage space as 1 comparable piece of wood. So this stack of steel would have taken up twice the space of it's wood counterparts.

Pour, pour me............

Not only is the living area slab poured, but also the cells of the CMU walls are filled with concrete to create an extremely robust foundation.

We saved so many trees that space on the construction staging site is tight. To protect the remaining trees from trauma, the concrete truck is parked in the street, and the concrete is pumped uphill.

The pumping process does add expense, but to me, protecting the natural assets of the property is well worth it.

Down below in the crawlspace, a thinner slab is poured to protect the vapor barrier that helps prevent moisture from entering.

I'll be CMU................


CMU is the construction term for concrete masonry unit. Using the batter boards you see in the distance as a guide, the outline of the house is marked on the concrete footing, and the block work has begun.

The experienced and skilled mason's constantly check to assure that the foundation walls are plumb and level.

The first photo shows the crawlspace area where the terrain drops off. There will also be enough head height for a tool room at the far end. Above this crawlspace, the bedroom wing of the home is located.

The second photo shows the living, dining, and kitchen foundation walls. This area will be back filled and compacted in order to receive a poured slab.

Sunday, June 26, 2016

Road to Somewhere...............

Once the drainage ditch pipe was set, it was time to amend the existing rough topography to accommodate a driveway.

We were so fortunate that we had permission to use dirt that had been deposited on another lot, so the process of adding & compacting that soil went very quickly & efficiently.

I'm using remnants of the trees we cut to keep the gravel in place. And I've also broken up branches & leaves into mulch to cover any bare earth.

My goal is to have the site walkable & erosion free, even after a rainfall.

Now we're ready for the building pad !


Sunday, June 12, 2016

"Pipe Down, Please"..................

The new land had a challenging topography starting immediately from the cul-de-sac. There were natural drainage ravines that had previously forced me to enter the lot on foot by way of the adjacent vacant lot, which has tamer contours.

So the first major construction step was to smooth out a driveway entrance, & lay down a 36 inch diameter pipe into the largest ravine.

 Once covered with unwanted fill dirt from another nearby site, this will mark the travel path for pedestrians & vehicles to our new home. The smaller ravines were filled in, & will now drain into this main drainage channel.

Game on !