The driveway was started today by grading & spreading stone. Now there truly is an Earthwood Drive. The road sign was originally for our street, but the county made the developers change it to Earthwood Court.
Monday, December 22, 2008
Got marshmellows?.....................
Saturday, December 13, 2008
Not playing with a full deck.......................
From the master bedroom & breakfast room, you access a modest sized deck. It's angled to face a good view of the creek.Stairs, & an eventual ramp will lead to the backyard.
On the deck will be our barbeque grill.
Below the deck will be the grill's gas tank & rain barrels which will hold water from the living roof.
Foam for the home......................
The attic & exterior walls are sprayed with open-cell foam. Windows are masked with plastic for protection.The foam expands irregularly, but is scraped by hand to provide a smoother surface for drywall installation.
Ultimately, the house will be like a sealed thermos bottle. To prevent mold, the heating & cooling system will mechanically bring in needed fresh air. Of course so will opening the windows.
MEP.......................
Wednesday, December 10, 2008
Shake it up, baby....................
Thursday, December 4, 2008
Final roof in place....................
Tanks a lot.......................
The septic holding tank is lowered & backfilled. Then a tank which will pump the waste to the drain field is likewise installed.
Tuesday, December 2, 2008
What a bunch of scrap.................
Saturday, November 22, 2008
And in the "car porch".....................
Saint Sophia has found a protected place, & hopefully will not continue to weather.
She had 3 daughters, Faith, Hope, & Love. Those three qualities were definitely needed in building this house.
She had 3 daughters, Faith, Hope, & Love. Those three qualities were definitely needed in building this house.
Meanwhile, on another part of the house.........
Up on the roof.........................
Monday, November 17, 2008
Tuesday, November 11, 2008
Stone cold great.....................
American graffiti......................
Tuesday, November 4, 2008
Sweet November........................
Wednesday, October 22, 2008
Looking a little blue...............................
Saturday, October 18, 2008
Nearly framed in.......................

------------------------------------------------------------
The chimney for the wood burning stove is sheathed in cement fiber board to receive stone.
------------------------------------------------------------------------------------------------
By walking across the living roof you reach the attic over the left side of the house. Inside, I can bring plants during the winter. The skylights crank open & have screens for nicer weather days.
We've switched to wood framing for the attic areas since continuing the steel framing get time consuming & expensive. If termites ever make it that far, they deserve a treat.
-------------------------------------------------------------------------------------------------
Tuesday, October 7, 2008
Oh, deer.................................
Monday, October 6, 2008
Progress continues.......................



-------------------------------------------------------------
Stairs in the tower are roughed in.
------------------------------------------------------------
By walking across the "living roof" you can enter an attic space. I'll probably use it as a greenhouse & workshop. It will have an operable skylight
------------------------------------------------------------
From the upstairs bedrooom window, you feel as if you're up in the trees.
Tuesday, September 30, 2008
Roof framing begins......................

.......................................................................................
I'm working on the earth berm against my office wall.
Piers for the rear deck are ready for the synthetic stone.
.......................................................................................
Beneath the deck will be the barrels that store captured rainwater from the roof.
Subscribe to:
Posts (Atom)




























The wall openings are weatherstripped & windows of recycled plastic are installed.











