Then the steel studs are placed. The exterior walls are of 6 inch studs to allow extra insulation for energy efficiency.
Saturday, August 30, 2008
Steel framing begins..............................
After laying out the plan on the floor, a runner channel is screwed into the subfloor.
Tuesday, August 26, 2008
Recycling project.........................
Views of the frame.....................
I'm very excited about the views from the creek side of the lot. Especially when the erosion control fence is removed after construction is complete.
Thursday, August 21, 2008
Steel frame for living roof.................
Tuesday, August 19, 2008
Subfloor continues......................
Tuesday, August 12, 2008
Subfloor begins......................
Friday, August 8, 2008
Floor joists are placed...................
Pressure treated sill plates are bolted to the foundation. Under the plate is a pink compressible sheet that seals any gaps from air infiltration.
Steel floor joists are attached to the pressure treated plates. Using steel is not totally eco friendly due to the intensive process of creating and shipping this product.
However, any waste can be recycled, and that's what we'll do along with the remaining pieces of reinforcing rods.
The future walls will also be framed out of steel. Sorry termites!
John & Mike measure for the steel columns that will support the living roof.
Steel floor joists are attached to the pressure treated plates. Using steel is not totally eco friendly due to the intensive process of creating and shipping this product.
However, any waste can be recycled, and that's what we'll do along with the remaining pieces of reinforcing rods.
The future walls will also be framed out of steel. Sorry termites!
John & Mike measure for the steel columns that will support the living roof.
Here's the view from below. I may try to rent this space out to a business that requires low overhead.
The crawlspace has a 2.5 inch poured concrete floor over a vapor barrier. This will keep out moisture, and provide a neat environment for working on the HVAC ducts.
The square openings will be glass block, to let in some light during the day. Probably won't save much electricity, but seemed like a cool idea.
Thursday, August 7, 2008
Stamped concrete...........
A tint is added to the standard concrete mix to add coloration, & then the concrete is poured.
After setting a while the slab is dusted with powder, stamps are positioned, & then tamped down to form the floor pattern. Dust flies everywhere, but will be washed away in a few days. The purpose of the dust is to keep the stamps from sticking to the still wet
concrete.
Here's the finished pattern.
After setting a while the slab is dusted with powder, stamps are positioned, & then tamped down to form the floor pattern. Dust flies everywhere, but will be washed away in a few days. The purpose of the dust is to keep the stamps from sticking to the still wet
concrete.
Here's the finished pattern.
Sunday, August 3, 2008
Garage slab ready to pour................