After laying out the plan on the floor, a runner channel is screwed into the subfloor.Then the steel studs are placed. The exterior walls are of 6 inch studs to allow extra insulation for energy efficiency.
This Blog tracks the construction of our new home north of Columbus, Georgia. I'm Jeff Ribnik, Architect, and this project is a personal exploration of energy efficient & environmentally friendly design.
Pressure treated sill plates are bolted to the foundation. Under the plate is a pink compressible sheet that seals any gaps from air infiltration.
A tint is added to the standard concrete mix to add coloration, & then the concrete is poured.
Here's the finished pattern.
Earth is backfilled & tamped at foundation wall. Notice the anchor bolts at the front pier. These will secure steel columns for the "living roof" portion of the house. This section will be all steel commercial construction.
This high tech Solar Glove Dryer is
the temporary rye grass for erosion control at street side is dying, so I'm spreading pine straw..............
reinforcing rods for the footings are placed after