The frame slopes from front to back to an eventual gutter & downspout. A rain barrel will collect the runoff for use in the garden.Thursday, August 21, 2008
Steel frame for living roof.................
The frame slopes from front to back to an eventual gutter & downspout. A rain barrel will collect the runoff for use in the garden.Tuesday, August 19, 2008
Subfloor continues......................
Tuesday, August 12, 2008
Subfloor begins......................
Friday, August 8, 2008
Floor joists are placed...................
Pressure treated sill plates are bolted to the foundation. Under the plate is a pink compressible sheet that seals any gaps from air infiltration.Steel floor joists are attached to the pressure treated plates. Using steel is not totally eco friendly due to the intensive process of creating and shipping this product.
However, any waste can be recycled, and that's what we'll do along with the remaining pieces of reinforcing rods.
The future walls will also be framed out of steel. Sorry termites!
John & Mike measure for the steel columns that will support the living roof.

Here's the view from below. I may try to rent this space out to a business that requires low overhead.
The crawlspace has a 2.5 inch poured concrete floor over a vapor barrier. This will keep out moisture, and provide a neat environment for working on the HVAC ducts.
The square openings will be glass block, to let in some light during the day. Probably won't save much electricity, but seemed like a cool idea.
Thursday, August 7, 2008
Stamped concrete...........
A tint is added to the standard concrete mix to add coloration, & then the concrete is poured.After setting a while the slab is dusted with powder, stamps are positioned, & then tamped down to form the floor pattern. Dust flies everywhere, but will be washed away in a few days. The purpose of the dust is to keep the stamps from sticking to the still wet
concrete.

Here's the finished pattern.Sunday, August 3, 2008
Garage slab ready to pour................
Saturday, July 26, 2008
Foundation complete....................
Thursday, July 17, 2008
Wednesday, July 16, 2008
Crawlspace backfilled.................
Earth is backfilled & tamped at foundation wall. Notice the anchor bolts at the front pier. These will secure steel columns for the "living roof" portion of the house. This section will be all steel commercial construction.Because the perimeter was designed to even increments of 16", there was relatively little wasted block. I'm placing the smaller flat pieces in the construction driveway, where they break into even smaller pieces among the existing rocks.
Tuesday, July 15, 2008
Cells are filled...................
Sunday, July 13, 2008
Recyclables...................
Foundation walls...............
This high tech Solar Glove Dryer isa must for every construction site.
I'll apply for a patent when I have more time.
Future occupants arrive to inspect progress.

The perimeter foundation wall is complete awaiting concrete to be poured into the cells of the block. This view is from the front door towards the basement ( workshop ) below the master bedroom. The remaining crawlspace will be conditioned to control moisture. Air conditioning ducts will be in the crawlspace, which is much more energy efficient than the attic.
Thursday, June 26, 2008
Friday, June 20, 2008
Prior to pouring footings....................
the temporary rye grass for erosion control at street side is dying, so I'm spreading pine straw..............we'll later plant pine trees to help replenish this mulch............
reinforcing rods for the footings are placed afterthe soil is tamped.....................
the transit was used to assure the bottom of the footing is level............................
fortunately, there's an adjacent field for "staging" the construction, so that we won't lose any more trees........
Thursday, June 19, 2008
Monday, June 9, 2008
Site setup continues..................
Friday, June 6, 2008
Thursday, June 5, 2008
Wednesday, March 12, 2008
Subscribe to:
Posts (Atom)




Columns are lowered by a huge crane on to bolts set in the concrete block piers. The bolts are then tightened.